Brisbane Cross River Rail is not open yet, and no visitor can ride it in 2026. The Cross River Rail Delivery Authority, the Queensland Government body building the line, states plainly in its official frequently asked questions that first passenger services are expected in 2029. That single fact changes how to plan a Brisbane trip today. The four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street are advanced construction and fit out sites, not stations you can enter, and the Exhibition station rebuild on the showgrounds loop is part of the same program. What travellers get right now is a clearer picture of how Brisbane will move once the tunnel opens, plus a set of current stations and busways that already do the job the new line will one day make faster.
Quick Facts
- Status: Under construction, not open. First passenger services are expected in 2029, per the Cross River Rail Delivery Authority.
- Route: A new 10.2 kilometre rail line from Dutton Park in the south to Bowen Hills in the north.
- Tunnels: 5.9 kilometres of twin tunnels under the Brisbane River and the central business district.
- New underground stations: Boggo Road, Woolloongabba, Albert Street and Roma Street.
- Also in the program: A new above ground station at Exhibition, a rebuild of seven stations between Dutton Park and Salisbury, and three new Gold Coast line stations at Pimpama, Hope Island and Merrimac.
- Total program cost: 19.041 billion Australian dollars to complete Cross River Rail and associated works, as announced by the Queensland Government in October 2025.
- What to use today: Existing Queensland Rail services through Roma Street, Central, South Brisbane and South Bank, plus the South East Busway and Brisbane Metro services.
Is Cross River Rail open for passengers?
No. This is the correction that matters most, because older coverage and early project material talked about a 2026 opening. The Delivery Authority current position, checked on 18 November 2026, is that major construction is being completed progressively through to 2027, and that a rigorous systems integration, operational testing and operational readiness process must follow before any passenger boards. The authority expects first passenger services in 2029. Tunnelling itself finished in 2021, which is why the project can look deceptively complete in aerial photographs. A finished tunnel is not a finished railway. Track, signalling under the European Train Control System, station systems, lifts, escalators, passenger information and trial running all have to work together, and then work together reliably, before the line can carry the public.
For visitors, the practical consequence is simple. Do not build an itinerary around an Albert Street arrival, do not book a hotel because it markets itself as steps from a Cross River Rail platform, and do not assume a direct underground ride to the Gabba precinct at Woolloongabba. Those benefits are real, but they belong to trips from 2029 onward. Trips in 2026 and 2027 and 2028 use the network Brisbane already has, which is described station by station below.
What will the four new underground stations actually do?
Boggo Road, in Dutton Park, links the new line to the existing Boggo Road busway station and to the health and research precinct around the Princess Alexandra Hospital. It is designed as an interchange first and a destination second, the place where a bus to train change that is awkward today becomes a short walk under cover. Woolloongabba puts a high frequency station a short walk from the Gabba stadium precinct and connects to the Woolloongabba bus station on the South East Busway. On event days that pairing matters more than any single journey time saving, because it spreads crowds across two modes instead of funnelling everyone through one road corridor.
Albert Street is the genuinely new piece of city geography. Brisbane central business district has never had a station in its southern half, and Albert Street fills that gap, serving the government and education quarter, the botanic gardens end of the city and the Queen Street Mall from the south. Roma Street is a rebuild inside a working interchange. The existing Roma Street station already handles suburban, long distance and busway services, and the Cross River Rail station adds an underground layer to that hub rather than replacing it. Travellers who know Roma Street today will use the same precinct, with more platforms below ground once the line opens.
What about Exhibition and the wider program?
Exhibition station, by the RNA Showgrounds in Bowen Hills, has historically opened mainly for events such as the Ekka. The Cross River Rail program delivers a new above ground, every day station there, so the showgrounds and the Herston health precinct gain a year round rail stop. Beyond the tunnel, the Delivery Authority program also rebuilds seven suburban stations between Dutton Park and Salisbury for accessibility, and builds three new stations on the Gold Coast line. Pimpama opened in October 2025 and Hope Island followed in May 2026, both confirmed in Queensland reporting, while Merrimac remains in construction. Those Gold Coast stations are usable now, which makes them the one part of the wider program a 2026 visitor can already ride to.
If your wider Australia planning includes the south, our 3 days in Melbourne itinerary shows how a city with a mature loop railway feels to use, and our first time in Sydney itinerary covers the harbour city rail and ferry mix that Brisbane visitors often combine in the same trip.
How should a visitor get around Brisbane until 2029?
Use Roma Street and Central as your two mental anchors. Roma Street serves the west end of the centre, the busway and long distance trains. Central serves the retail core and connects to every suburban line. South Brisbane and South Bank stations serve the cultural precinct, the Queensland Museum, the Gallery of Modern Art and the South Bank parklands across the river, and they are the closest current equivalents to what Albert Street will one day offer the southern centre. For the Gabba, the Woolloongabba bus station on the South East Busway does the event job today, backed by special event buses. For the airport, the Airtrain runs from Roma Street and Central. A go card or contactless payment works across trains, buses and ferries under Translink, so one payment method covers the whole interim plan.
Expect construction effects, not construction closures of the whole city. The Delivery Authority publishes a travel checker for track closures and road changes around its sixteen worksites, and weekend possessions on the Beenleigh and Gold Coast lines have been a recurring pattern while surface stations are rebuilt. Check Translink before a weekend airport run, allow one extra service of buffer, and treat any hotel claim about Cross River Rail as a claim about 2029, not about your stay.
Why is Brisbane building a second river crossing at all?
Every Brisbane train that crosses the river today uses the Merivale Bridge corridor, a single bottleneck that caps how many services the whole South East Queensland network can run. Cross River Rail adds a second crossing in tunnel, which is why its benefits are network wide rather than limited to the four new stations. Once the tunnel carries Beenleigh and Gold Coast services through the centre, capacity on the existing corridor frees up for other lines, and more frequent services become possible across the region. That is also why the program cost, at 19.041 billion dollars including associated works, the European Train Control System and station rebuilds, is far larger than the tunnel alone. Travellers in 2029 will feel it as frequency and reliability first, and as a shorter walk in the southern city centre second.
Frequently asked questions
When does Brisbane Cross River Rail open?
First passenger services are expected in 2029, according to the Cross River Rail Delivery Authority. It is not open in 2026, and no opening month has been published.
Can I visit the new Albert Street or Boggo Road stations now?
No. All four underground stations are construction and testing sites with no public access. You can see station entrances and precinct works from the street at Roma Street, Albert Street, Woolloongabba and Boggo Road, but you cannot enter or ride from them.
Which Brisbane stations should I use instead today?
Use Roma Street for the busway, long distance trains and the west end, Central for the retail core, and South Brisbane or South Bank for the cultural precinct and South Bank. Use the Woolloongabba bus station for events at the Gabba.
Has any part of the wider program already opened?
Yes. On the Gold Coast line, Pimpama station opened in October 2025 and Hope Island opened in May 2026. Merrimac is still in construction, and the seven station rebuilds between Dutton Park and Salisbury are being completed progressively.
Will Cross River Rail serve Brisbane Airport?
Not directly. Airport trains will continue to use the existing Airtrain line through Roma Street and Central. Cross River Rail improves capacity across the network those airport services share, but it does not build a new airport station.
Photo: Track laying on the Cross River Rail corridor. Cross River Rail Delivery Authority, Queensland Government, via the official Cross River Rail website. The source image was 600 pixels wide and has been upsized to 1600 pixels for publication.