Iguazu Falls and the Devil’s Throat in Late 2026: The Argentine Walkway Closure and What the Brazilian Side Still Shows You

Dawn over the falls at Iguazu, from the Brazilian national park. Image: Urbia Cataratas, via the Brazilian park operator's official website at cataratasdoiguacu.com.br.

Here is the current status at Iguazu Falls, checked against the park operators for late November 2026: on the Argentine side, the Devil’s Throat walkway circuit is closed and has been since 3 August 2026, when its metal walkways were dismantled and moved to dry ground as a flood precaution, and there is no reopening date. On the Brazilian side, the walkway that reaches out facing the Devil’s Throat is open again: it closed from 11 to 30 October 2026 as the river rose and reopened on 31 October 2026 after inspection and railing reinstallation. Everything else on both sides is operating: Argentina’s Upper Circuit, Lower Circuit and Green Trail and the Rainforest Ecological Train, and Brazil’s Falls Trail with its viewpoints. So a visitor in late 2026 or early 2027 still gets a full, magnificent falls trip, including a frontal view of the Devil’s Throat from Brazil, but cannot walk out over the river to the Argentine balcony above it. This article explains what that means day by day, and how to plan around it.

Quick Facts

  • Argentine Devil’s Throat circuit: Closed since 3 August 2026; walkways dismantled as a flood precaution; no reopening date announced
  • Brazilian Devil’s Throat walkway: Closed 11 to 30 October 2026 for flooding; reopened 31 October 2026 after inspection and railing reinstallation
  • Open in Argentina: Upper Circuit, Lower Circuit and Green Trail, plus the Rainforest Ecological Train to Cataratas Station
  • Open in Brazil: The Falls Trail, Trilha das Cataratas, its viewpoints and the Devil’s Throat walkway, subject to daily river conditions
  • The history in one line: The Argentine walkway that is now dismantled had itself reopened on 13 July 2024 after the October 2023 flood destroyed most of it; nothing completed a rebuild in late 2026
  • The rule for visitors: Walkway status follows the river and can change within days; check the operators’ channels the day before each visit

The Argentine Side: A Closure, Not a Rebuild

Start with the correction, because the Argentine story has been widely mistold. The Devil’s Throat circuit in Iguazu National Park, Argentina, is the park’s signature walk: the Rainforest Ecological Train to the Devil’s Throat station, then about 1.1 kilometres of metal walkway across the upper Iguazu River to a balcony suspended over the U shaped chasm where most of the river gathers and falls. That walkway has a hard history with the river. The October 2023 flood destroyed most of it, and the rebuilt walkway reopened on 13 July 2024. In 2026 the river threatened again, and this time the operator moved first: on 3 August 2026 the concessionaire, Iguazu Argentina, began dismantling the walkway floors and railings and moving them to dry ground ahead of the expected flood peak, a job expected to take weeks, with the parks administration stating the walkways will be reassembled when the state of the river allows it technically. No reopening date has been announced, and the circuit remains closed at the time of writing. The operator’s own site, Iguazu Argentina, is the authority for any change, and a detailed park reference at the Devil’s Throat circuit page on iguazu.ar records the same position: closed since 3 August 2026, no reopening date, with reassembly expected to take 30 to 60 days once the water drops.

So any headline claiming a completed rebuild or a reopened Argentine walkway in late 2026 is wrong, and any itinerary built on walking to the Argentine balcony this season will fail at the train station. What has replaced it, in practice, is a rebalanced Argentine day, and it is a better day than disappointed visitors expect.

What Argentina Still Shows You Without the Devil’s Throat

The Argentine park holds about 80 percent of the falls system, and its two great circuits are untouched by the closure. The Upper Circuit walks the brink of the falls along the upper river, a level, accessible sequence of walkways and balconies looking down the faces of the major drops. The Lower Circuit descends toward the base, with stairs, spray and the closest ground level views, including the viewpoint toward the Devil’s Throat from below and across the water. The Green Trail links the visitor centre area with Cataratas Station, where the Ecological Train still runs; only the train’s onward leg to the Devil’s Throat station is pointless while the walkway is down, and the park’s day naturally reorganizes around the two circuits, taken slowly, with the Lower Circuit early before the heat and the tour groups build.

Our pillar guide to Iguazu Falls from both sides works through the full Argentine and Brazilian day in this same closure period, and our logistics guide to getting to Iguazu Falls in order covers the two airports, the two park entrances and the border crossing between them. Read together with this status piece, they give you the complete current picture: what is open, how to reach it, and in what order to walk it.

The Brazilian Side: A Reopening, and the View of the Throat

Brazil’s park, reached from Foz do Iguacu, is the panoramic half of the falls: one main trail, the Trilha das Cataratas, running along the opposite bank with a sequence of viewpoints that widen as you walk, ending at the walkway that reaches out into the gorge facing the Devil’s Throat, with an elevator and viewing platforms at its end. That final walkway is the one structure in the whole system that puts a visitor in front of the Throat itself this season. It had its own flood episode this autumn: it closed on 11 October 2026 under the park’s flow based safety protocol as the river climbed, and it reopened on 31 October 2026 after inspection and reinstallation of its railings. A reopening after a three week closure, note, not a rebuild, and the distinction matters because the walkway’s status remains conditional: the same protocol can close it again whenever the river rises, and visitors should treat its opening as a daily fact, not a seasonal guarantee. The Brazilian park’s operator, Cataratas do Iguacu, the Urbia Cataratas concession, publishes the park’s current notices and is the check to make on the morning of a Brazilian day.

The planning consequence is simple and worth stating plainly: in late 2026 and until Argentina announces otherwise, the Brazilian day has moved from optional extra to essential. It is now the only side from which the Devil’s Throat can be seen head on and at close range, from the walkway in its spray. Visitors with only one day should weigh that carefully against the Argentine circuits’ greater depth, and visitors with two days should do both, Brazil first if the river forecast looks unsettled, so the Throat view is banked while its walkway is open. Entry formalities for crossing between the two towns are covered in our explainers on Argentina’s entry rules and Brazil’s visitor visa start dates, and the falls combine naturally with the Argentine northwest in our guide to Salta and the Calchaqui Valleys for anyone building a longer Argentina itinerary around the trip north.

Planning Around the Closure: A Workable Late 2026 Itinerary

A sound two day plan in the current conditions runs like this. Day one, Argentina: enter at opening, walk the Lower Circuit first while it is quiet and cool, ride the train to Cataratas Station for the Green Trail and the visitor facilities, and finish with the Upper Circuit along the brink in the afternoon light. Skip the Devil’s Throat station entirely; there is nothing to see at the end of that leg but the start of a dismantled walkway. Day two, Brazil: walk the Falls Trail slowly, take every viewpoint, and save the Devil’s Throat walkway for the end of the trail, where it belongs, checking the operator’s notices that morning in case the river has closed it again. Keep a half day of slack in the trip if the falls are its whole purpose, because the one variable no one controls is the river, and a single day’s rise can change the Brazilian walkway’s status overnight.

Two habits protect the trip. First, verify status from the operators, not from hotel desks or older guides: this article’s own position was checked against operator reporting in late November 2026, and it will age exactly as fast as the river dictates. Second, resist any source that gives the Argentine walkway a reopening date. None exists. When reassembly becomes possible, the park has indicated the work itself takes 30 to 60 days from the river dropping, so even good news about water levels will not mean an open walkway the following week.

Frequently Asked Questions

Is the Devil’s Throat walkway open?

On the Argentine side, no: it has been closed since 3 August 2026, its walkways dismantled as a flood precaution, with no reopening date. On the Brazilian side, the walkway facing the Devil’s Throat reopened on 31 October 2026 after a flood closure from 11 to 30 October, and it remains subject to closure whenever the river rises.

Did the Argentine walkway complete a rebuild in 2026?

No. The rebuilt Argentine walkway reopened on 13 July 2024, after the October 2023 flood destroyed most of it. In August 2026 it was dismantled again, this time deliberately and in advance of flooding, which is why reassembly is expected to be quicker once conditions allow.

Is Iguazu still worth visiting while the Argentine walkway is closed?

Yes. Argentina’s Upper and Lower Circuits, the Green Trail and the Ecological Train are all operating, and the Brazilian trail gives the frontal view of the Devil’s Throat from its reopened walkway. What you lose is one balcony; what remains is most of one of the world’s great waterfalls.

When will the Argentine Devil’s Throat circuit reopen?

No date has been announced. The park’s position is that the walkways will be reassembled when the river’s state allows it technically, and reassembly itself is expected to take 30 to 60 days once it can start. Check Iguazu Argentina’s channels before travelling.

Which side should I choose if I have only one day?

While the Argentine walkway is closed, Brazil offers the only close, frontal view of the Devil’s Throat, in a half day format. Argentina offers the deeper, fuller day across its two circuits. Choose Brazil for the Throat, Argentina for the system, and both if you possibly can.

Featured image: Dawn over the falls at Iguazu, from the Brazilian national park. Image: Urbia Cataratas, via the Brazilian park operator’s official website at cataratasdoiguacu.com.br.

Avatar photo

Written by Rafael Santos

Rafael Santos leads Always Packed's South America coverage, from Afro-Brazilian cultural capitals to Andean high routes and Amazon river journeys. His guides pair the continent's scale with ground-level practicality: altitude, distances, seasons, and the neighbourhoods where a city actually lives. Rafael writes about Afro-Latin heritage as a central thread of the continent's story, and his Brazil coverage treats Salvador, Recife, and Rio as the distinct worlds they are. This profile is an Always Packed editorial desk, a named collection of editors and researchers publishing under a shared beat and voice.

An aerial view of the sandbar and bays of Vieques, Puerto Rico, the island the Ceiba ferry serves. Image: Ethan Jameson, via Unsplash (unsplash.com), used with credit via captioned hosted copy.

The Ceiba to Vieques Ferry, Explained: Online Tickets, the Resident Rules and the Day-of Routine

A CBP officer checks a vehicle entering the United States at a border crossing port of entry. Photo by James Tourtellotte, U.S. Customs and Border Protection, via cbp.gov

How Canadian Visitors Complete US Entry at Land Borders: Documents and Wait Times Explained